Egypt

The Prime Minister inspects the candidate water station in Assiut

Dr. Mustafa Madbouly, Prime Minister, and his companions, inspected a project to replace, renew and raise the efficiency of the Czech candidate water station in the eastern city of Assiut, and to line up equipment, as well as a project to restore the first water operation in Assiut since the era of King Farouk, and that & nbsp; during his visit to inspect a number of service and development projects in Assiut Governorate. Engineer/ Sherif El -Sherbiny, Minister of Housing, Utilities and Urban Communities, that the state pays great attention to drinking water and sanitation projects in the various governorates of the Republic, especially in rural areas, which was translated into the presidential initiative projects & quot; a decent life & quot; To develop the villages of the Egyptian countryside, within the framework of Egypt’s Vision 2030 to achieve the sustainable development goals. Assiut.

& nbsp; A capacity of 600 liters/second, and reaching 51 thousand cubic meters on the end of the implementation of the development project that benefits half a million people at a total cost of 245 million pounds.

& nbsp;

& nbsp; Water -nominated water, nominated water pumps, pillow units, ponds of concentration, pisting building, chlorine and chemical unit, obstetric unit, warehouse and workshop unit, and the unit of the administration building, in addition to pipelines, public location and processing and restoration work. Linking equipment for the drinking water and sewage sector in the city of Assiut in the governorate, at the drinking water and sanitation company in Assiut and the New Valley, which included a number of vehicles and various equipment that included drinking water transport vehicles, sewage cars with different capacities, sewage cleansing cars, loaders and excavators, heavy excavation equipment, cranes, and cars equipped with hydraulic peace Fixed and mobile diesel generators, and mobile maintenance workshops, as well as submersible pumps to withdraw water with different diameters and industrial respirators to secure diver. The components of the lineup of equipment and their numbers, which come within the framework of the continuous efforts of the province to ensure readiness and prepare to deal with any emergency events, indicating that the equipment is distributed over the entire geographical sectors of the governorate, which includes in the eastern Abnoub, Al -Fateh, Sahel Salim and Badari centers, and in the northern sector, the Dairut, Qusiya and Manflout centers, and in the southern sector, Abu Petig Centers Al -Ghaneem and Sadfa, and in the midfield in the eastern and west neighborhoods and the center of Assiut. The candidate station is currently in a number of wells and the current building and was the main source of water during that period, adding that it contains an artesian well that opened during the reign of King Farouk, and with the population increase in the city the German candidate that opened during the era of President Gamal Abdel Nasser was established, pointing out that the buildings are still standing up today Lifting that was used to distribute water.

& nbsp;

  • For more: Elrisala website and for social networking, you can follow us on Facebook
  • Source of information and images “rosaelyoussef”

Related Articles

Leave a Reply

Back to top button

Discover more from Elrisala

Subscribe now to keep reading and get access to the full archive.

Continue reading