The Minister of Housing follows up on unit implementation rates "Housing for all Egyptians" In 3 cities
Engineer Sherif El-Sherbiny, Minister of Housing, Utilities and Urban Communities, followed the executive position of the units of the presidential initiative "Housing for All Egyptians – Low- and Middle-Income Axis" In the cities of New Cairo, 10th of Ramadan, and Capital Gardens, through the results of inspection tours of the projects.
Engineer Sherif El-Sherbiny stressed the speedy completion of the implementation of the units to make them available to the citizens allocated to them, or to offer them to meet the increasing demand for residential units. He stressed that the Ministry is working to implement the directives of President Abdel Fattah El-Sisi to provide housing units that suit and suit the various segments of society, through the Ministry’s policy that relies on 3 axes, which are: support For the low-income segment – where the state bears more than half of the unit value through direct and indirect support, support for the middle-income segment, and making it available to the highest income segment, in a way that achieves the principle of social justice, by using the material returns from the highest income segments to provide support to the limited-income segment. And the development of unsafe areas.
In this context, Engineer Abdel Raouf Al-Ghaity, head of the New Cairo Authority, continued his field tours to inspect the projects being implemented in the city, where he passed the site of the buildings of the presidential initiative “Housing for Everyone.” Egyptians" In the Third Settlement, where 222 residential buildings containing 5,328 units are being implemented, with areas ranging from 90 m2 to 120 m2.
Al-Ghaiti continued the tour by following up on road works in the Narges extension area, “New Narges.” In the Third Settlement, where the foundation layer was completed, in addition to following up on road works in the Gardenia neighborhood in the Third Settlement.
Engineer Alaa Abdullah Mostafa, head of the Tenth of Ramadan City Development Authority, inspected the work of completing the units of the presidential initiative “Housing for All Egyptians.” ; A low-income axis in the 20th District, within the framework of the directives of the Minister of Housing, to periodically follow up on the implementation of urban development projects.
Engineer Alaa Abdullah Mustafa explained that the project includes 98 buildings with a total of 3,252 residential units, a model of 4 units per floor, with an area of 90 meters. square per unit, indicating that the completion rate reached about 99%.
In the same context, Engineer Ammar Mandour, head of the development agency, inspected Capital Gardens City, some of the projects being implemented in the city, including: "Housing for all Egyptians" The low-income axis and the middle-income axis in an area of 2,350 acres.
The tour of the head of the Capital Parks City Authority included a review of the position and plan of the project’s facilities and roads implementation work, and the mechanism and stages of implementation, with an emphasis on adherence to the timetable, stressing the implementation of the work according to specifications. And the quality required for the project, and overcoming any obstacles, stressing that these works are a continuation of the ongoing development plans in the various axes of the city.
- For more: Elrisala website and for social networking, you can follow us on Facebook
- Source of information and images “rosaelyoussef”“