The National Railway Authority announced banking dates Trains on the Qantara East/Bir al-Abd line and vice versa and the Kafr Daoud line/ Sadat And vice versa with vehicles, long live Egypt The Commission decided the following:
First: – Al-Qantara East / Bir Al-Abd and vice versa: –
• Train 291 departs from Qantara East station at 07:30 Arrives at Bir al-Abd station at 09:30 Install (4 carts, long live Egypt) as the attached table .
• Train 290 departs from Bir al-Abd station at 10:00 and arrives at Qantara Sharq station at 12:00 By installing (4 long live Egypt vehicles) as shown in the attached table.
• Train 293 departs from Qantara East station at 12:30 Arrives at Bir al-Abd station at 14:30 Install (4 carts, long live Egypt) as the attached table
• Operating a train 292 Departs from Bir al-Abd station at 15:00 and arrives at Qantara Sharq station at 17:00 By installing (4 long live Egypt vehicles) as shown in the attached table.
Secondly: – Bashteel/Sadat/Kafr Daoud line :-
• Operating train 787 Bashteel/Sadat departs from Bashteel station at 05:10 and arrives at Sadat station at 07:50 with the installation of (5 cars, Long Live Egypt ) as shown in the attached schedule.
• Operating train 788 Sadat/Bashteel, departing from Sadat station at 16:50 and arriving at Bashteel station at 19:15 with the installation of (5 carriages, Long Live Egypt ) as shown in the attached schedule.
• Operating train 792 Sadat / Kafr Daoud, departing from Sadat Station at 09:00 and arriving at Kafr Daoud Station at 09:50 with the installation of (5 cars, Long Live Egypt ) as shown in the attached schedule.
• Operating train 793 Kafr Daoud / Sadat, where he departs from Kafr Daoud station at 11:10 and arrives at Sadat station at 12:05 by installing (5 Long Live Egypt vehicles ) as shown in the attached schedule.
• Operating train 794 Sadat/Kafr Daoud, departing from Sadat station at 13:00 He arrives at Kafr Daoud station at 1:50 p.m. with the installation of (5 Long Live Egypt vehicles), as shown in the attached schedule.
• Operating train 795 Kafr Daoud / Sadat, arriving from Kafr Daoud station at 14:45 It arrives at Sadat Station at 15:40 with the installation of (5 Long Live Egypt vehicles), as shown in the attached schedule.
The Authority stresses that it spares no effort to ensure the comfort of the passenger public. These trains are cheaper and faster Compared to other means of transportation, which contributes to Serving a large number of passengers on both lines, and the areas it passes through are characterized by Kafr Daoud Sadat line With high population density and Qantara East Line / Bir al-Abd It has great importance in contributing to the development of Sinai and serving the people of beloved Sinai.