Egypt

Esmat inspects the Helwan power station and continues the operating pattern in preparation for the opening

In the context of continuous field follow -up and continuous visits to work and production sites and the work plan to change the operating pattern, achieve efficiency in performance, improve nutrition quality, ensure the continuity of electricity, increase generated energies, reduce the use of traditional fuel, and ensure the advancement of the level of services and economic operation of subsidiary companies, Dr. Mahmoud Esmat Minister of Electricity and Renewable Energy, & nbsp; Today, Wednesday, a field visit to the South Helwan Bukhari Electricity Station in the cream area, with a capacity of 1950 megawatts, which represents 31% of the total energy generated in the Upper Egypt Electricity Production Company and operates with a system of urgent pressure cycle with a total cost of building 1.5 billion dollars, in order to follow the course of Work and determine the actual reality of operation, performance rates and fuel consumption. Governorates within the company’s work, total generated energy, the number of generation stations, fuel used, and the new work plan in the framework of changing the operating pattern, the extent of the impact of this on the rates of fuel use and productive energy, the implementation of maintenance programs and connection with control centers, workers training, occupational safety and health courses, providing spare parts and coordination with the company Holding and sister companies in this regard. The efficiency of units work and the total energy generated and compared to the rates of fuel consumption, in addition to the maintenance plan and time schedules for implementation, coordination and connection with the control center, the extent of response and the speed of meeting the needs of the unified national network for electricity and operating loads and the impact of this on fuel consumption rates, and Dr. Esmat touched on the station’s work plan to prepare To increase the loads during the summer and finish the implementation of the maintenance during the current month, and how to confront faults, their rates and levels of various levels and the speed of the work teams respond within the general plan to achieve operation quality and improve performance rates and economic operation policy, as well as adhere to occupational safety and health standards within the station and training programs to develop Performance and keenness to apply the maximum protection for workers and provide the necessary safety tools and supplies The energy system and upgrading the rates of performance and operation of the generation stations, reduce fuel use and find practical solutions to technical loss, the need to pay attention to maintenance and reconsider the mechanisms used in programs, timing and timetables, the importance of training programs and formulating specialized programs for each sector and the importance of coordination between all sectors based on operating stations and consolidating a culture Intervention and reform before the units leave and follow this at all levels to achieve stability for the unified network and ensure safe and stable operation.

& nbsp; Performance, noting the importance of activating the role of faults, safety, occupational health, inspection and quality control committees to maintain a safe work environment, adding that there is a daily follow -up to improve the quality of operation and increase the return on the fuel unit used from generated energy and upgrade the level of electrical service, stressing the continuation of the current work plan to achieve operation Economic of the National Electricity Network.

  • For more: Elrisala website and for social networking, you can follow us on Facebook
  • Source of information and images “rosaelyoussef”

Related Articles

Leave a Reply

Back to top button

Discover more from Elrisala

Subscribe now to keep reading and get access to the full archive.

Continue reading